PROJECTS

Medical Training Facility

Location: Joint Base San Antonio, Lackland AFB

Project Size: (sq. ft.) 36,500

Project Summary: New two story modern office facility, contracted through the United States Army Corps of Engineers(USACE) Louisville District, to support three medical squadrons and Command group. This project included demolition of three existing buildings to clear the site and the construction of the new two story building. Site utilities were also part of this contract and included a new underground medium voltage duct bank, new medium voltage cable, new transformer, and replacing an existing VFI switch. This project will be able to receive a United States Green Building Council(USGBC) Leadership in Energy and Environmental Design(LEED) rating of Silver.